Vaisala HMP228 Guía de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 57
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
Chapter 4 __________________________________________________________ Installing the probe
VAISALA _______________________________________________________________________ 13
1. Shut down the process if the process pressure is more than 10 bars. If
the pressure is lower there is no need to shut down the process.
2. Make the installation according to the figure below. Install the sensor
head transversely against the direction of the process flow.
3. Make sure that the temperature at the measurement point is equal to that
of the process, otherwise the moisture reading may be incorrect.
NOTE
The probe can be installed in the process through the ball valve
assembly provided that the process pressure is less than 10 bars. This
way, the process does not have to be shut down for installing or
removing the probe. However, if the process is shut down before
removing the probe, the process pressure can be max. 20 bars.
1. probe
2. Tighten clasp nut first manually; probe is then
sliding easily.Finally tighten with an plastic wrench
about 30-40°, to have a stable installation, Note: do
not overtighten this screw!
3. handle of the ball valve
4. ball of the ball valve
5. process chamber / pipeline
6. manual press tool
7. the groove on the probe indicates the upper
adjustment limit
Stage 1 Stage 2
1
2
3
4
5
6
7
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 56 57

Comentarios a estos manuales

Sin comentarios