
User's Guide ______________________________________________________________________
60 ___________________________________________________________________M210630EN-B
cover at least 5 mm of the outlet. Make sure that the tube is not
blocked or bent during the transportation.
0201-019
Figure 40 Pressure Sensor Tube Connection
4. The internal battery should always be installed when the weather
station is in operation. The battery supplies backup power to the
station and is needed for keeping the time and date information. To
insert the internal battery, you may have to bend battery terminals.
Connect the flat connectors to battery terminals (numbers 1 and 2
in Figure 41 on page 61). Connect the red wire to the positive pole
(+), and the black wire to the negative pole (-). The battery lead(s)
is disconnected during shipping. It is recommended to disconnect
the lead also if the station is not used for several weeks (no
charging). When storing the station for a few days, use SLEEP
command to reduce the power consumption and discharge of the
battery.
Comentarios a estos manuales