
User's Guide ______________________________________________________________________
82 ___________________________________________________________________M210630EN-B
Installing on a Pedestal
1. Drill out three holes in the base to the 6.5 mm in diameter and clean
off burr. For details, see Figure 68 on page 82.
2. For the pegs, drill out a hole in the each corner of the pedestal plate.
Clean off burr.
0002-011
Figure 68 Rain Gauge Pedestal Plate Dimensions
3. Place the pedestal plate with rain gauge assembly on the ground
using the pegs supplied. If force is needed, then remove the rain
gauge first. See Figure 69 on page 82.
9901-011
Figure 69 Assembling QMR102 on the Ground with
Pedestal Plate
4. Connect the signal cable to a data logger.
5. Continue from section Finalizing the Installation on page 83.
Comentarios a estos manuales